Skip to content
Industrial site served by Greer Enterprises in Greenville.

Greenville County · South Carolina service area

Hazardous waste disposal in Greenville, SC

Advanced manufacturing. Disposal, recycling and transport handled by Certified Hazardous Materials Managers, with the paperwork done right on every load.

Mobile, AL 251-679-1967Tampa, FL 833-670-2200

  • Certified Hazardous Materials Managers on staff
  • ISO 14001 registered
  • Licensed hazardous waste transporter
  • Licensed medical waste transporter
  • Serving the Southeast since 2001

Greer Enterprises provides hazardous waste disposal, recycling and transport for generators in Greenville, SC. We characterize the stream, assign waste codes, manifest the shipment and route it to a permitted facility, under SCDES and federal RCRA rules.

Serving Greenville, SC

Local service for Greenville and Greenville County

Greenville anchors the Upstate manufacturing corridor along I-85, with BMW's plant near Spartanburg and its supplier base, tire makers and machinery builders. Paint waste, metalworking fluids and plating waste are routine.

Typical generators in the Greenville area: BMW supplier network, automotive and tire manufacturing, advanced materials, machinery. That mix decides which waste codes show up and which treatment capacity matters, so a Greenville quote is built from your process, not a rate card.

What we handle

Waste streams we see most in Greenville

Each stream has its own treatment route. Here is where the ones that come up most often locally actually go.

Automotive paint and coating waste

Booth sludge, waste coatings and resins are usually ignitable (D001) and often carry F-listed solvents. Liquids with fuel value go to fuels blending. Fully cured resin and dried coatings are separated out, since they are often non-hazardous.

Paint and coating waste

Tire and rubber processing chemicals

Process waste is profiled from process knowledge, backed by analysis where needed, and assigned its listed and characteristic codes. The codes decide the options: incineration, fuels blending, stabilization or injection. You see the route before anything ships.

RCRA hazardous waste

Metalworking fluids and machining coolant

Spent metalworking fluids are tested first. Many are not hazardous waste and go out as non-hazardous industrial waste at a lower cost. If tramp oil or metals push a batch over, only that batch is managed as hazardous.

Non-hazardous industrial waste

Plating and surface treatment waste

Plating wastewater sludge is often F006 listed, and spent baths can carry cyanide or hexavalent chromium. Metals are recovered where concentrations justify it; otherwise the waste is stabilized and sent to a permitted landfill.

Plating and metal finishing waste

One company, every service line

Everything Greer handles in Greenville

Most sites generate more than one kind of regulated waste. One company covers all of it, so there is one contact and one set of records.

Hazardous waste

RCRA and non-RCRA waste, lab packs, profiling and manifests, with incineration, fuels blending, stabilization and landfill options.

Waste management services

Medical waste

Sharps, red bag, pathological and pharmaceutical waste through Bio Med Solutions, Greer's medical waste division. Containers, manifests and proof of destruction included.

Medical waste disposal

Recycling

Beneficial reuse for surplus and expired chemicals, petroleum product recycling, and recycling programs for paper, cardboard, plastics, metals and glass.

Recycling services

Transportation

Roll-off boxes, box trucks, flatbeds, end dumps, dry vans and vacuum trucks. Every Greer vehicle carries real-time fleet monitoring.

Transportation services

Emergency response

Spill response, on-site containment and time-sensitive dispatch when something goes wrong outside the regular schedule.

Emergency response transport

Online compliance training

An online OSHA compliance program with employee training, SDS management, a safety plan builder and facility self-audits.

Online training

South Carolina regulations

The rules that apply to Greenville sites

South Carolina Department of Environmental Services (SCDES) runs the hazardous waste program in South Carolina through its Bureau of Land and Waste Management. EPA has authorized the state program, so South Carolina Regulation 61-79 is the rulebook your site is inspected against. It adopts the federal RCRA framework and adds requirements of its own.

Where South Carolina goes beyond the federal baseline

  • South Carolina levies hazardous waste disposal and treatment taxes that affect in state disposal economics
  • Environmental programs moved from DHEC to the new Department of Environmental Services in 2024, so older guidance may reference the former agency
  • The state maintains capacity restrictions on hazardous waste received from out of state

How it works

From first call to closed record in Greenville

Upstate South Carolina on I-85. The state's densest manufacturing corridor.

Tell us what you have

Send an SDS, an old manifest, a process description or photos of the containers. A technical professional reviews it, not a call center.

Characterize and profile

Process knowledge, backed by lab analysis where it is needed, sets the federal and South Carolina waste codes and builds the waste profile.

Name the treatment path

Before anything is scheduled you see where each stream is going and why: recovery, fuels blending, incineration, stabilization or injection.

Package and label

Containers, labels and markings meet DOT and RCRA rules. Our crews can pack on site, including lab packs and unknowns.

Pickup and transport

Greer's licensed transport carries the load under a signed manifest, with the right placards and shipping papers for every hazard class.

Close the record

The signed manifest comes back from the receiving facility, followed by the certificate of treatment. Your file is ready for SCDES.

Generator status

What your generator category means in Greenville

Your obligations depend on how much hazardous waste the site generates in a calendar month. Most of the cost and paperwork follows from this one number.

Very small quantity generator

100 kg or less a month, and no more than 1 kg of acute hazardous waste. The lightest rules, but the waste still has to reach a facility authorized to take it.

VSQG requirements

Small quantity generator

More than 100 kg and less than 1,000 kg a month. Up to 180 days on site (270 if the nearest treatment facility is over 200 miles away), and re-notification every four years.

SQG requirements

Large quantity generator

1,000 kg or more a month, or over 1 kg of acute hazardous waste. A 90-day accumulation limit, a contingency plan, annual training records and periodic reporting.

LQG requirements

An episodic event such as a cleanout or a turnaround can push a site into a higher category for a month. Tell us before it happens and we will plan the paperwork with you.

The paperwork

What every Greenville shipment leaves behind

The record is the deliverable. Every shipment produces:

  • Signed Uniform Hazardous Waste Manifest, EPA Form 8700-22
  • Land disposal restriction notification for every regulated stream
  • Waste profile with assigned codes and the supporting basis
  • Certificate of destruction or treatment from the receiving facility
  • Documentation that holds up to a SCDES inspection

Keep these for at least three years. Manifests, LDR notices and test results are the first things an inspector asks for, and the retention clock is extended while an enforcement action is open.

Industries

Industries we serve in Greenville

Sector pages with the streams, codes and treatment routes for each:

Straight answers

Greenville questions

Do you actually service Greenville?

Yes. Upstate South Carolina on I-85. The state's densest manufacturing corridor. Greer holds hazardous waste transporter authorization in South Carolina and has operated across the Southeast since 2001.

Which agency regulates my Greenville site?

South Carolina Department of Environmental Services, through the Bureau of Land and Waste Management. South Carolina is authorized by EPA to run the RCRA program, so state rules at South Carolina Regulation 61-79 apply in place of the federal regulations.

How is a quote put together?

Per stream, not per site. Volume, container type, water content, BTU value and the distance to the receiving facility all move the number. You get the treatment path named, plus the recovery option where one exists.

We only generate a few drums a year. Is Greenville still worth a stop?

Yes. Small and very small quantity generators are scheduled onto consolidated routes, so a few drums share a truck instead of paying for a dedicated run.

Can one company take our hazardous and medical waste?

Yes. Greer is a licensed hazardous waste and medical waste transporter, and medical waste runs through Bio Med Solutions, our medical division. The two travel on separate paperwork, as the rules require, but you deal with one company.

What if something spills or goes wrong at our Greenville site?

Call. An urgent situation is a phone call to a technical professional, not a ticket in a queue. We will tell you what to do first and what we can send.

Get started

Get a price for your Greenville site

Send a profile, an old manifest, or photographs of the drums. A technical professional reviews every request.

Service availability and routing are described in general terms. Confirm current coverage and scheduling for your site when you request pricing. Last reviewed September 2026.