Skip to content
Industrial site served by Greer Enterprises in Birmingham.

Jefferson County · Alabama service area

Hazardous waste disposal in Birmingham, AL

Alabama's industrial core. Disposal, recycling and transport handled by Certified Hazardous Materials Managers, with the paperwork done right on every load.

Mobile, AL 251-679-1967Tampa, FL 833-670-2200

  • Certified Hazardous Materials Managers on staff
  • ISO 14001 registered
  • Licensed hazardous waste transporter
  • Licensed medical waste transporter
  • Serving the Southeast since 2001

Greer Enterprises provides hazardous waste disposal, recycling and transport for generators in Birmingham, AL. We characterize the stream, assign waste codes, manifest the shipment and route it to a permitted facility, under ADEM and federal RCRA rules.

Serving Birmingham, AL

Local service for Birmingham and Jefferson County

Birmingham was built on iron and steel, and the foundries, pipe plants and fabrication shops that grew out of that history still shape its waste profile. The UAB medical and research complex adds a steady flow of laboratory and clinical waste alongside the heavy industry.

Typical generators in the Birmingham area: Steel and foundry operations, pipe manufacturing, automotive supply, medical and research institutions. That mix decides which waste codes show up and which treatment capacity matters, so a Birmingham quote is built from your process, not a rate card.

What we handle

Waste streams we see most in Birmingham

Each stream has its own treatment route. Here is where the ones that come up most often locally actually go.

Foundry sand and baghouse dust

Foundry sand and baghouse dust are TCLP tested for lead, cadmium and chromium. What passes can often be reused or landfilled as non-hazardous, and only the fraction that fails is managed and priced as hazardous waste.

Landfill disposal

Metal finishing and plating sludges

Plating wastewater sludge is often F006 listed, and spent baths can carry cyanide or hexavalent chromium. Metals are recovered where concentrations justify it; otherwise the waste is stabilized and sent to a permitted landfill.

Plating and metal finishing waste

Coke and coal tar residues

Coking residues such as tar decanter sludge carry K-listed codes (K087 and related), which set the treatment standard whatever a test shows. They go to thermal treatment, or back into the coking process where the plant's permit allows it.

K-listed waste

Laboratory chemicals from research campuses

A technical professional inventories the chemicals on site, segregates them by compatibility and packs them into DOT-rated containers. Unknowns are field tested first. Each drum goes to the treatment its contents need, usually incineration or fuels blending.

Lab pack services

One company, every service line

Everything Greer handles in Birmingham

Most sites generate more than one kind of regulated waste. One company covers all of it, so there is one contact and one set of records.

Hazardous waste

RCRA and non-RCRA waste, lab packs, profiling and manifests, with incineration, fuels blending, stabilization and landfill options.

Waste management services

Medical waste

Sharps, red bag, pathological and pharmaceutical waste through Bio Med Solutions, Greer's medical waste division. Containers, manifests and proof of destruction included.

Medical waste disposal

Recycling

Beneficial reuse for surplus and expired chemicals, petroleum product recycling, and recycling programs for paper, cardboard, plastics, metals and glass.

Recycling services

Transportation

Roll-off boxes, box trucks, flatbeds, end dumps, dry vans and vacuum trucks. Every Greer vehicle carries real-time fleet monitoring.

Transportation services

Emergency response

Spill response, on-site containment and time-sensitive dispatch when something goes wrong outside the regular schedule.

Emergency response transport

Online compliance training

An online OSHA compliance program with employee training, SDS management, a safety plan builder and facility self-audits.

Online training

Alabama regulations

The rules that apply to Birmingham sites

Alabama Department of Environmental Management (ADEM) runs the hazardous waste program in Alabama through its Land Division, Hazardous Waste Branch. EPA has authorized the state program, so ADEM Administrative Code Division 335-14 is the rulebook your site is inspected against. It adopts the federal RCRA framework and adds requirements of its own.

Where Alabama goes beyond the federal baseline

  • Alabama operates a hazardous waste fee program funding the Hazardous Substance Cleanup Fund
  • The state imposes disposal fees on hazardous waste landfilled in Alabama, which affects the economics of in state versus out of state disposal
  • Emelle, in Sumter County, hosts one of the largest commercial hazardous waste landfills in the country

How it works

From first call to closed record in Birmingham

Roughly four hours north of our Mobile base on I-65. Scheduled routes run weekly.

Tell us what you have

Send an SDS, an old manifest, a process description or photos of the containers. A technical professional reviews it, not a call center.

Characterize and profile

Process knowledge, backed by lab analysis where it is needed, sets the federal and Alabama waste codes and builds the waste profile.

Name the treatment path

Before anything is scheduled you see where each stream is going and why: recovery, fuels blending, incineration, stabilization or injection.

Package and label

Containers, labels and markings meet DOT and RCRA rules. Our crews can pack on site, including lab packs and unknowns.

Pickup and transport

Greer's licensed transport carries the load under a signed manifest, with the right placards and shipping papers for every hazard class.

Close the record

The signed manifest comes back from the receiving facility, followed by the certificate of treatment. Your file is ready for ADEM.

Generator status

What your generator category means in Birmingham

Your obligations depend on how much hazardous waste the site generates in a calendar month. Most of the cost and paperwork follows from this one number.

Very small quantity generator

100 kg or less a month, and no more than 1 kg of acute hazardous waste. The lightest rules, but the waste still has to reach a facility authorized to take it.

VSQG requirements

Small quantity generator

More than 100 kg and less than 1,000 kg a month. Up to 180 days on site (270 if the nearest treatment facility is over 200 miles away), and re-notification every four years.

SQG requirements

Large quantity generator

1,000 kg or more a month, or over 1 kg of acute hazardous waste. A 90-day accumulation limit, a contingency plan, annual training records and periodic reporting.

LQG requirements

An episodic event such as a cleanout or a turnaround can push a site into a higher category for a month. Tell us before it happens and we will plan the paperwork with you.

The paperwork

What every Birmingham shipment leaves behind

The record is the deliverable. Every shipment produces:

  • Signed Uniform Hazardous Waste Manifest, EPA Form 8700-22
  • Land disposal restriction notification for every regulated stream
  • Waste profile with assigned codes and the supporting basis
  • Certificate of destruction or treatment from the receiving facility
  • Documentation that holds up to a ADEM inspection

Keep these for at least three years. Manifests, LDR notices and test results are the first things an inspector asks for, and the retention clock is extended while an enforcement action is open.

Straight answers

Birmingham questions

Do you actually service Birmingham?

Yes. Roughly four hours north of our Mobile base on I-65. Scheduled routes run weekly. Greer holds hazardous waste transporter authorization in Alabama and has operated across the Southeast since 2001.

Which agency regulates my Birmingham site?

Alabama Department of Environmental Management, through the Land Division, Hazardous Waste Branch. Alabama is authorized by EPA to run the RCRA program, so state rules at ADEM Administrative Code Division 335-14 apply in place of the federal regulations.

How is a quote put together?

Per stream, not per site. Volume, container type, water content, BTU value and the distance to the receiving facility all move the number. You get the treatment path named, plus the recovery option where one exists.

We only generate a few drums a year. Is Birmingham still worth a stop?

Yes. Small and very small quantity generators are scheduled onto consolidated routes, so a few drums share a truck instead of paying for a dedicated run.

Can one company take our hazardous and medical waste?

Yes. Greer is a licensed hazardous waste and medical waste transporter, and medical waste runs through Bio Med Solutions, our medical division. The two travel on separate paperwork, as the rules require, but you deal with one company.

What if something spills or goes wrong at our Birmingham site?

Call. An urgent situation is a phone call to a technical professional, not a ticket in a queue. We will tell you what to do first and what we can send.

Get started

Get a price for your Birmingham site

Send a profile, an old manifest, or photographs of the drums. A technical professional reviews every request.

Service availability and routing are described in general terms. Confirm current coverage and scheduling for your site when you request pricing. Last reviewed September 2026.