Skip to content
trash truck at landfill

Waste services

Hazardous waste landfill disposal

Subtitle C landfill for treated and stabilized waste, and the treatment that has to come first.

Hazardous waste landfills operate under RCRA Subtitle C with double liners, leachate collection and groundwater monitoring. Waste must meet land disposal restriction treatment standards before it can be landfilled, which for most streams means treatment first.

Source: 40 CFR Part 264 Subpart N, and Part 268

Streams that end up here

  • Stabilized metal bearing sludges and filter cake
  • Contaminated soil after treatment to meet standards
  • Debris treated to the applicable standard
  • Incinerator ash and air pollution control residue
  • Asbestos containing material where applicable
  • Solidified waste meeting land disposal restriction standards

Treatment before land disposal

The land disposal restrictions exist to stop untreated hazardous waste going into the ground. For most streams that means stabilization, which binds constituents into a matrix that resists leaching, and the treated waste is then tested against the standard.

This is why landfill is rarely the cheapest route despite sounding like it should be. The gate price is only part of it; the treatment to get the waste eligible is frequently the larger cost.

Facility requirements

  • Double liner with leachate collection and detection between the liners
  • Groundwater monitoring wells upgradient and downgradient
  • Run on and run off controls
  • Waste analysis plan and receipt verification
  • Financial assurance for closure and 30 years of post closure care
  • Operating record and annual reporting

Common questions

Can hazardous waste go straight to landfill?

Only if it already meets the land disposal restriction treatment standard as generated, which is uncommon. Most streams require treatment first, and the LDR notification records which situation applies.

Is landfill cheaper than incineration?

Per ton at the gate, usually. Including the treatment needed to qualify, often not. The honest comparison is total delivered cost, which is what we quote.

Where are hazardous waste landfills located?

Commercial Subtitle C landfill capacity is limited nationally. Alabama hosts one of the largest at Emelle in Sumter County, which affects routing economics across our footprint.

Related services

Not sure how this applies to your site?

Send a profile, an old manifest, or photographs of the drums. A technical professional will tell you where you stand.

This page summarizes federal requirements and is not legal advice. State programs can be more stringent than the federal baseline. Verify against current federal and state regulations before acting. Last reviewed September 2026.