Tennessee compliance
Tennessee hazardous waste generator requirements
Registration, categories and the duties TDEC applies to generators.
Generators in Tennessee follow the federal generator categories, VSQG, SQG and LQG, as adopted into Tennessee Rule 0400-12-01. TDEC administers EPA identification numbers, and state specific fees and notification requirements apply on top of the federal duties.
Source: Tennessee Rule 0400-12-01, adopting 40 CFR Part 262Generator categories as applied in Tennessee
The federal thresholds apply. What varies by state is fees, notification and reporting frequency.
| Category | Monthly generation | Accumulation limit | EPA ID required |
|---|---|---|---|
VSQG | Up to 100 kg | No time limit | Check state rule |
SQG | 100 to 1,000 kg | 180 days, 270 over 200 miles | Yes |
LQG | 1,000 kg or more | 90 days | Yes |
What TDEC expects on site
Applies to SQGs and LQGs, with LQG duties broader:
- An EPA identification number obtained through the state
- Containers marked Hazardous Waste with the accumulation start date
- Weekly documented inspections of accumulation areas
- Personnel training appropriate to the generator category
- A written contingency plan and quick reference guide for LQGs
- Manifests and land disposal restriction notifications retained three years
- State fees paid on the schedule the program sets
State specific points to check
Tennessee charges hazardous waste generator and facility fees supporting the state program
The state operates its own hazardous waste remedial action program alongside the federal system
TDEC requires annual reporting from generators above defined thresholds, which is more frequent than the federal biennial cycle
Common questions
How do I get an EPA ID number in Tennessee?
Through TDEC. The application is Form 8700-12, submitted to the state rather than to EPA in an authorized state. Allow processing time before you need to ship.
Do very small quantity generators register in Tennessee?
Federal rules do not require it, but authorized states often do. Confirm with the state program rather than assuming the federal position applies.
What happens if I generate more than usual one month?
Your category for that month is set by actual generation. The episodic generation provisions may let you handle a one off event without a permanent category change, provided you notify and ship within 60 days.
Related services
Generating hazardous waste in Tennessee?
Send a profile, an old manifest, or photographs of the drums. A technical professional will tell you what applies and what it costs.
This page summarizes state and federal requirements and is not legal advice. State rules change. Verify against the current version of the state code and with the state agency before acting. Last reviewed September 2026.